I finally got around to posting some pictures of my recently completed vanity in the head. These pictures probably span about a 4 month period. A project that I basically fit in when I could.
I started off with fiber-glassing in a backing block for the foot pump.
This jug catches grey water to be used to flush the toilet periodically. The overflow goes out of the thru-hull that is locate behind the jug. The hose coming from below is from the sump pump. I drew arrows on the hoses to help understand.
A different angle.
Full view of vanity prior to adding front.
This is a template I used prior to transferring to teak veneer plywood.
After the plywood was cut into doors and varnished.
Finished product. Now to add the 110V outlet.